German multinational Wieland Thermal Solutions selected Garcia, Garcia for the expansion of its production facility in Esposende.

This Design & Build project aimed to increase the production capacity of the German company.
The project included the construction of a new production area, the refurbishment of the current production building and the rehabilitation and expansion of the administrative and social area.
The new industrial building was designed in prefabricated concrete and the existing one has undergone a structural reinforcement ir order to support the expansion.
For the expansion of the administrative and social area a new floor was built over the existing area. In order to carry this out, a reinforcement of the building structure was needed.
The project also included the remodeling and improvement of all the building areas.

Year

2017

Total Floor Area

4.945 m2

Administrative and Social Area

1.155 m2

Production Area

3.790 m2

Location

Esposende

Lead Time

8 Months

© 2018 Garcia Garcia SA - 3402- PUB. All rights reserved.
Cookies Settings

GARCIA GARCIA may use cookies to store your login information, collect statistics to optimize site functionality, and perform marketing actions based on your interests.

These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
They allow you to be in touch with your social network, share content, send and post comments.

Necessary Cookies These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.

Funtional Cookier These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.

Advertisement Cookies They allow you to be in touch with your social network, share content, send and post comments.