GG's know-how in the design and execution of industrial buildings enabled it to define a structured solution in concrete that, besides increasing the building's fire safety, enhanced the speed of the construction process.
In order to meet the needs of the multinational, one of the challenges taken on by GG at the conceptual design stage was to maximise the usable floor area and to eliminate structural physical obstructions in the production area.
For this purpose, a wide structural grid was designed, reducing the number of columns within the production area, thereby enhancing the free and modular definition and implementation of the production layout by WEG.
2016
17.800 m2
1.300 m2
15.700 m2
Santo Tirso
8 Months
GARCIA GARCIA may use cookies to store your login information, collect statistics to optimize site functionality, and perform marketing actions based on your interests.
Necessary Cookies These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
Funtional Cookier These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
Advertisement Cookies They allow you to be in touch with your social network, share content, send and post comments.