The new and modern building will support SISMA's growth by doubling its production capacity.
The bold architecture of the building stamps the surrounding landscape and helps to renovate the urban line entry in Oporto.
The new industrial building, designed from scratch, has three distinct functional areas, physically separated but linked together: an administrative and social block, a technical area and a production area.
In the design of the new industrial building, particular attention was paid to sustainability, for which contributes the use of solutions that promote energy efficiency and minimization of the environmental footprint, such as natural lighting, the system for the production of electricity through panels photovoltaic and the treatment and reuse of rainwater for industrial and sanitary consumption.
2018
4.088 m2
826 m2
3.262 m2
21.291 m2
21.291 m2
Maia
9 Months
GARCIA GARCIA may use cookies to store your login information, collect statistics to optimize site functionality, and perform marketing actions based on your interests.
Necessary Cookies These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
Funtional Cookier These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
Advertisement Cookies They allow you to be in touch with your social network, share content, send and post comments.