Through implementation of this innovative project, designed by the Central de Arquitectos architectural firm, Garcia, Garcia has contributed to the setting up of a new industrial facility in the north of the country, to the creation of new jobs and to the development of the wind power cluster.
Of the construction of this industrial plant the focus is on the two floors of the manufacturing zone, which maximises the total useful area and allows the best possible advantage to be taken of the spaces.
2013
8.100 m2
600 m2
7.500 m2
Viana do Castelo
8 Months