Design & Build

Industrial

Robobeck

Beck Automation awarded Garcia, Garcia its new project in Portugal, striving to increase its production capacity and thus empower access to new markets.

The new industrial unit stands out for its aesthetic modernity and simple lines, marked by details that lead back to the corporate identity.
In functional terms, the building will comprise a single block, functionally divided into two areas, namely production and administrative/staff. The building was conceived in order to promote the versatility of the space, allowing to easily alter the layout of machinery and work stations.
It should also be noted that the building is equipped with an energy efficiency system, through photovoltaic energy production, which will enable the use of solar energy to decrease its environmental impact and reduce energy bills.

Year

2021

Total Floor Area

1 700 m2

Location

Barcelos

Lead Time

06 months

© 2018 Garcia Garcia SA - 3402- PUB. All rights reserved.
Cookies Settings

GARCIA GARCIA may use cookies to store your login information, collect statistics to optimize site functionality, and perform marketing actions based on your interests.

These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
They allow you to be in touch with your social network, share content, send and post comments.

Necessary Cookies These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.

Funtional Cookier These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.

Advertisement Cookies They allow you to be in touch with your social network, share content, send and post comments.