Construction

Industrial

Real Marbre

Real Marbre entrusted the construction of a new production plant to Garcia Garcia. Located in the Industrial Zone of Neiva, nearby to other production units of the group, this investment will allow the creation of 30 new jobs in the region.

The new building stands out for its differentiated outline and features, excelling in the use of noble stones, such as marble for example.
Conceived as the ex-libris of the building, the façade is marked by a large honeycomb structure, symbolically representing the innovative production process developed by the company.
In functional terms, the building will comprise an administrative and staff block with an area of 1,200m2 on two floors, of which 300 m2 are intended for a showroom. The production area covers a total area of 3,300 m2.

Year

2020

Total Floor Area

4.585 m²

Location

Viana do Castelo

Lead Time

12 Months

© 2018 Garcia Garcia SA - 3402- PUB. All rights reserved.
Cookies Settings

GARCIA GARCIA may use cookies to store your login information, collect statistics to optimize site functionality, and perform marketing actions based on your interests.

These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
They allow you to be in touch with your social network, share content, send and post comments.

Necessary Cookies These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.

Funtional Cookier These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.

Advertisement Cookies They allow you to be in touch with your social network, share content, send and post comments.