The new facility spans 9,300 m² and includes production, storage, and technical support areas, with a strong focus on energy efficiency systems. The building, constructed with precast concrete, was designed to meet industrial functionality requirements while ensuring thermal and operational comfort.
One of the project’s main challenges was the phased execution, which allowed the existing unit to remain operational throughout the construction. The infrastructure also incorporates technical solutions aimed at safety and environmental protection, including an optimized ventilation system, containment zones, and a wastewater treatment station.
2025
9300
Arcos, Vila do Conde
GARCIA GARCIA may use cookies to store your login information, collect statistics to optimize site functionality, and perform marketing actions based on your interests.
Necessary Cookies These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
Funtional Cookier These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
Advertisement Cookies They allow you to be in touch with your social network, share content, send and post comments.