The project involved the expansion of Kirchhoff's facilities with the construction of a new building, divided into two structurally independent blocks.
The first, in reinforced concrete and with three elevated floor designed to increase the social and administrative areas of the complex, is located in the the transition between the existing and the new building,.
The second block, in metallic structure, is aimed to increase Kirchhoff's production capacity, receiving new production lines for the German multinational.
2019
8.460 m2
1.180 m2
7.280 m2
Ovar
10 months