The new centre has the most advanced warehouse-management information and fire-detection and firefighting systems, as well as sophisticated intrusion and access-control and video surveillance systems.
Also underscored is the floor flatness, certified to TR34/2003 category 1 traffic for defined traffic and FM1 for random traffic, a pioneering characteristic in Portugal, ensuring fluid movement of cargo-handling equipment.
Of the materials and manpower used in the construction of the centre 81% were of Portuguese origin
2011
13.850 m2
3.200 m2
10.650 m2
Maia
9 Months