The design and construction of this building had to accommodate two critical factors: the production of heat resulting from the manufacturing process and the specific weather conditions of its location, where high temperatures are recorded.
With these constraints, the technical solutions adopted included, among others, a system of adiabatic coolers interconnected with mechanical blowers and natural ventilation, allowing temperature and humidity to be corrected within the facility, allied to the use of insulating materials on the roof and façades and a brise-soleil system for the windows.
In this project, the infrastructure is outstanding for the system of collection and treatment of industrial effluents, with reuse of the washing water through a process of neutralisation by CO2. This system raises the levels of efficiency in water consumption to about ¼ of the consumption of a domestic process.
2011
6.400 m2
750 m2
5.650 m2
Silves
7 Months
GARCIA GARCIA may use cookies to store your login information, collect statistics to optimize site functionality, and perform marketing actions based on your interests.
Necessary Cookies These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
Funtional Cookier These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
Advertisement Cookies They allow you to be in touch with your social network, share content, send and post comments.