After the construction of the Logistic Center, Brasmar entrusted Garcia Garcia Garcia the construction of its new Food Production Unit.

This project, for the development of a frozen seafood processing unit, included the rehabilitation of the existing plant with 1 800 m2 and the construction of a new area with 6 000 m2.
The new unit, due to the large cold rooms, was equipped with an advanced climate control system to guarantee the required temperature control.
In addition, to assure an optimal thermal insulation a high performance isothermal panel was used. Noteworthy is the freezing tunnel spiral that was installed in the plant.

Year

2017

Total Floor Area

7.800 m2

Administrative and Social Area

750 m2

Location

Trofa

Lead Time

8 Months

© 2018 Garcia Garcia SA - 3402- PUB. All rights reserved.
Cookies Settings

GARCIA GARCIA may use cookies to store your login information, collect statistics to optimize site functionality, and perform marketing actions based on your interests.

These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.
They allow you to be in touch with your social network, share content, send and post comments.

Necessary Cookies These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.

Funtional Cookier These cookies are required to enable the site's primary functionality and are automatically enabled when you use this site.

Advertisement Cookies They allow you to be in touch with your social network, share content, send and post comments.