The new facilities will maximise the company's supply chain and at the same time leverage the growth of its business in Portugal, as well as providing support for other needs arising in other geographic areas.
One of the engineering challenges taken on by Garcia, Garcia was to maximise the open internal floor area and to eliminate structural obstacles in the production area. A structural solution was therefore defined in pre-fabricated concrete with a wide structural grid in order to reduce the number of pillars.
Its construction also included the option of flooring with a high standard of flatness with FM2 certification, as well as the installation of seven loading bays for HGVs and five for vans.
2017
9.100 m2
2.100 m2
7.000 m2
Malveira
7 Months